Bid/Tender Calculation

DynaRoad services creates a resource based schedule for your project. The schedule is based on your bill of materials, available resources and their production rates. With the help of both Gantt and Time-location planning (a.k.a. Time-chainage or Time-distance) it is possible to locate and plan around possible bottlenecks. When Gantt focuses on one critical path, we see them all with the help of a Time-location diagram. We examine the cost of haul obstacles (e.g. bridges, tunnels), local mass deficit and surplus, the required amount of stockpiling and optimum location for disposal and crushing areas. Based on this data we provide suggestions for design optimization, which cuts construction costs.